Construction Machinery
Cranes, Port gantry cranes,
Mining trucks, Forklifts
UPS
Communication base station
Medical site
Subway platform
Military and Aerospace Applications
Hybrid armored vehicle
Ultra-high power power supply equipment
Energy Storage
Battery Energy Storage System Grid Side
Battery Energy Storage System Mains Side
Battery Energy Storage System User Side
Multi-energy integrated energy storage system
Rail Public Transportation
Subway, High-speed rail, Locomotive,
Bus, Port IGV
Electric Machine
AGV, Warehousing and logistics trolley,
Crane
Multi-Energy Integration
Hydrogen hybrid truck
Diesel hybrid generator
LTO batteries can provide advanced solutions forhigh-power driving/braking and low-temperature starting in the development of electrification for engineering machinery. This is mainly based on their special anode material, which offer longer cycle life and intrinsic safety, enabling equipment to be more efficient and reliable.
Yongxing Special Material
Jiangxi Yichun Huaqiao Lithium
Beijing Subway Line 13 Self-Traction Project
320KW / 65kWh LTO
Line 22 will be deliverd in 2025
Line 13B will be delivered in 2025
LTO battery provides a solution for upgrading emergency backup power to emergency traction drive power for rail transit trains. Not only do they offer higher safety and longer lifespan, but they also enable the train to have functions such as emergency self-traction or last-mile self-driving.
Ningbo Langchen Independent Energy Storage Power Station Project
20MW/ 10MWh LTO + / 45MW/ 90MWh LFP
World’s largest LTO Battery power station
Ningbo Energy Group 50MW/100MWh independent energy storage power station, located in Ningbo Yuyao Guangyao Thermal Power station, is the first batch of new energy storage demonstration projects in Zhejiang Province in the "14th Five-Year Plan", the capacity of LFP energy storage system is 45MW/90MWh, and the capacity of LTO energy storage system is 5MW/10MWh(the LTO battery system can be enhanced to higher power capability).
The project started in October 2022 and is scheduled for trial operation in June 2023. As the first batch of grid-side independent energy storage power stations in Zhejiang Province, participating in the power spot trading and power auxiliary service market can significantly improve the eiciency of new energy consumption in the region, and also provide a strong guarantee for the construction of a diversified integration of highly flexible power grid.
LTO energy storage stations (on the user side) are primarily dedicated to addressing the issue of significant fluctuations caused by user-generated renewable energy or high-power loads. Thanks to their highpower and long lifespan, they enhance power stability and affordability for users in a safer manner.
Jiuli's "high-low mix and match"
energy storage power station
2MW/ 0.5MWh LTO + 3.75MW/ 7.5MWh LFP
Yongxing Special Steel 12MW/
12MWh hybrid storage power station
8MW/ 4MWh LTO + 4MW/ 8MWh LFP
In the realm of energy storage stations (on the power grid side), LTO battery offer a solution for both primary and secondary frequency regulation, boasting a lifespan of up to 10 years. They excel in meeting the challenge of frequent charge and discharge cycles in the frequency regulation domain, while also satisfying the high-power and high-safety demands of the power sector with their rapid charge and discharge capabilities and intrinsic safety features.
3MW/ 2.5MWh + 3MW/ 0.9MWh LTO
Hunan China Resources Qiaokou Thermal Storage Joint Frequency Modulation Power Exchange Project
18MW/ 5MWh LTO
improve user portrait
Build a multi-dimensional customer label system, improve user portraits through indicators such as source, event and clue quality, establish accurate customer stratification, and improve sales.
Uninterruptible Power Supply (UPS) is typically used to provide short-term power continuation in the event of a power outage, preventing data loss or equipment damage before backup power sources can start. LTO batteries can ofer a safer and more reliable power supply. The only lithium battery currently capable of replacing the existing lead-acid batteries insidedata centers.
Equipment room UPS
30kWh LTO
Factory UPS
167kWh LTO